BACK

PS RUDNIK 5

PS RUDNIK 5

    • PS Rudnik 3-PS Rudnik 5
    • Municipality:
    • Kostolac
    • Duration of contruction:
    • 2018 -
    • Investor:
    • JP EPS
    • Contractors:
    • ENERGOTEHNIKA JUZNA BACKA / HIDRO TAN

Execution of works on PS 110/6 kV

2X16 MVa and construction of transmission line TS 110 kV